Engineer and inspector reviewing ferry permit paperwork beside a regional jet

Permits and compliance

Ferry permit vs special flight permit: what you actually need

For technical and compliance teams deciding whether an aircraft can legally be moved this month.

  • August 26, 2025
  • 6 min read

What is the difference between a ferry permit and a special flight permit?

In FAA language they are the same document: a special flight permit, often called a ferry permit, authorises an aircraft that does not currently meet all airworthiness requirements to fly to a place where it can be repaired, altered, stored or delivered. It is separate from overflight and landing permits, which are diplomatic clearances issued by each state on the route.

Key takeaways

  • A special flight permit covers airworthiness, not airspace access
  • Overflight and landing permits are per state and have their own lead times
  • Permit limitations shape the route, the crew brief and the weather minima
  • Non-FAA registries issue their own equivalents with different evidence requirements

Two different pieces of paper

The most common confusion in a ferry project is treating airworthiness approval and airspace approval as one process. They are separate, they are issued by different bodies, and they fail for different reasons.

  • Special flight permit or ferry permit: issued by the state of registry authority, allows a non-conforming aircraft to fly a defined route
  • Overflight permit: issued by each state whose airspace you transit
  • Landing permit: issued by the state where you intend to land, including tech stops
  • Customs and immigration clearance: separate again, arranged with the handler at each stop

What limitations to expect

A permit is granted with conditions, and those conditions are the real planning constraint. Common ones include crew only on board, no revenue payload, day VFR operation, a maximum altitude, a maximum airspeed, gear down flight or a restriction on operating over congested areas and open water.

Each of those changes the route. A gear down ferry burns far more fuel and adds tech stops. A day VFR restriction removes the overnight departure that would otherwise have made the crew duty plan work.

Lead times that catch people out

Overflight permits in parts of Africa, Central Asia and the Middle East regularly need five to ten working days, and some states will not process an application without a confirmed handling agent and a sponsor letter. A permit application refused on a Thursday afternoon can cost a full week.

We apply for permits in parallel with the maintenance sign-off rather than after it, so the paperwork and the airframe become ready on the same day.

Registry differences

N registered aircraft follow the FAA special flight permit path. Irish, Isle of Man, Guernsey, San Marino and Bermuda registered aircraft each have their own equivalent, with different evidence requirements around maintenance status, insurance and the qualifications of the crew making the flight.

Common questions

Last reviewed May 18, 2026 by the Super Universal operations desk.

Where this applies on our site

Every ferry pulls in a type, a route and a registry. These pages cover the parts that sit next to this one.

Services to pair with it

All services

Aircraft we move

All aircraft

Regions and crossings

All regions

Registries we work with

  • Guernsey

    2- prefix · Guernsey Aircraft Registry

  • San Marino

    T7 prefix · San Marino Aircraft Registry

  • Bermuda

    VP-B prefix · Bermuda Civil Aviation Authority

  • N-registered (FAA)

    N prefix · United States Federal Aviation Administration

All registries

Tell us where the aircraft is and where it needs to be

We will come back with a route, a realistic date and a fixed price.